Landfill Engineering Services

 
  • TOWN OF PATTERSON, Patterson, New York
    Landfill Closure Plan, cover system design, plans and specifications, construction supervision and post closure monitoring. STERLING obtained NYSDEC approval for Mandate Relief Variances allowing deletion of the gas vent layer and one half the thickness of the barrier protection layer of the final cover. STERLING also secured approval for placement of more than 20,000 cubic yards of demolition debris for rough grading purposes. These approvals reduced the actual closure cost by more than 50% of the original estimate. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis. Additionally, STERLING developed EQBA Grant Applications as well as assisted the Town in securing a SRF Low Interest Loan for the landfill closure.
    Contact: Michael Griffin, Supervisor
    845/878-6564
  • TOWN OF MONTGOMERY, Montgomery, New York
    Landfill cover installation, construction certification, EQBA Grant Application and Payment Request. STERLING successfully obtained design variances from the NYSDEC eliminating the gas vent layer of the final cover while also obtaining a $550,000 grant reimbursement from NYSDEC. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis.
    Contact: Richard Hoyt, Attorney
    845/778-1800
  • FICA LANDFILL, Poughkeepsie, New York
    Site investigations and development of landfill closure, plans and specifications, construction supervision. STERLING secured most of the grading and final cover materials from a variety of alternative sources. Some of the material was accepted at no cost to the owner. Additional materials, such as coal ash, were accepted with a tip fee which was applied to the closure fund.
    Contact: Kevin Young, Esq.
    518/438-9907 ex 225
  • FRESHKILLS LANDFILL, New York City, New York
    Expert testimony and evaluations concerning the remediation of the Freshkills Landfill.
    Contact: James Periconi, Esq.
    212/213-5500
  • PELHAM BAY LANDFILL, New York City, New York
    Expert testimony and evaluations concerning the remediation of the Pelham Bay Landfill.
    Contact: James Periconi, Esq.
    212/213-5500
  • SENECA MEADOWS, INC., Waterloo, New York
    Permitting, closure plan, groundwater remediation project for 100-acre landfill site in Western, New York.
    Contact: Carl Casaccia
    315/539-5624
  • CENTRAL HUDSON GAS & ELECTRIC, Danskammer, New York
    Landfill siting study for a coal ash management landfill. Developed NYSDEC Beneficial Use Application for utilization of coal fly ash within landfill closure and construction projects.
    Contact: Michael Gallucci
    845/486-5456
  • TOWN OF SHAWANGUNK, Wallkill, New York
    Landfill Closure Plan, cover system design, plans and specifications for the Town landfill. STERLING developed an application resulting in the Town receiving an SRF Low Interest Loan for the Landfill Closure. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis.
    Contact: John Valk, Supervisor
    845/895-2900
  • CASELLA WASTE MANAGEMENT - SUNDERLAND LANDFILL, Sunderland, Vermont
    Landfill Closure Grading Plan and Conceptual Landfill Closure Plan.
    Contact: Larry Lackey
    802/223-7221
  • CASELLA WASTE MANAGEMENT - BOLA LANDFILL, Whitehall, New York
    Landfill Closure Plan, construction supervision and resident engineering for the landfill final cover construction.
    Contact: John Casella
    802/775-0325
  • TOWN OF ROTTERDAM, Rotterdam, New York
    Conducted an investigation of leachate from the municipal solid waste landfill and evaluated alternatives for mitigation of impacts to groundwater, design onsite leachate treatment system.
    Contact: John Paolino, Supervisor
    518/355-7575
  • TOWN OF CLARKSTOWN LANDFILL, Clarkstown, New York
    STERLING was retained by the Town of Clarkstown to mediate a $6,000,000 construction claim associated with the closure of the Clarkstown landfill. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on a quarterly basis.
    Contact: Luke Kalarickal
    845/639-2111
  • TOWN OF SOUTHEAST LANDFILL, Brewster, New York
    Landfill Closure Plan, cover system design, plans and specifications for the Town landfill. STERLING developed an application resulting in the Town receiving an SRF Low Interest Loan for the Landfill Closure. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis.
    Contact: John Dunford, Supervisor
    845/279-4313
  • TOWN OF FALLSBURG LANDFILL, South Fallsburg, New York
    Landfill Closure Plan, cover system design, plans and specifications for the Town landfill. STERLING developed an application resulting in the Town receiving an SRF Low Interest Loan for the Landfill Closure. STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis.
    Contact: Will Illing, P.E., Town Engineer
    845/434-6320
  • TOWN OF BETHEL LANDFILL, Bethel, New York
    STERLING currently conducts monitoring well sampling and explosive gas surveys, analyze the results and submit a progress report to the NYSDEC on an annual basis.
    Contact: Glenn Smith, P.E., Town Engineer
    845/796-2216
  • TOWN OF MONROE LANDFILL, Monroe, NY
    STERLING is updating the pre-closure site investigations and developing a landfill closure plan and design.
    Contact: Sandy Leonard, Supervisor
    845/783-1900
   
Sterling Environmental Engineering, P.C.
24 Wade Road
Latham, New York 12110
Ph: (518) 456-4900
Fax: (518) 456-3532
sterling@sterlingenvironmental.com
   
  ©2011 Sterling Environmental Engineering, P.C.
   
  design by brighteyedesign